$120.64
Beautiful, lightweight red kimono made of slightly sheer Japanese silk, with a silk belt. The kimono is in almost perfect condition; only a minimal discoloration can be found on the inner lining at the collar (see last photo). The kimono is hand-stitched and not lined. It is light and perfect as an elegant house robe or a stylish coat.
Detail 👘
🔸Length 160 cm (63" )
🔸Back Width 60 cm (23.62")
🔸Includes an Obijime - Belt
🔸 Material: Silk
🔸 Condition: Excellent vintage condition
🔸 Color: red
🔸 Style: Unlined kimono (Hitoe) – ideal for spring and summer
🔸 Original Kimono from Japan
✨ Find styling tips on our Instagram: www.instagram.com/kimonomaedchen
Discover more Japanese clothing and accessories: www.KimonoMaedchen.com
*What’s my size? Have a look here: https://www.kimonomaedchen.com/post/933368394199/whats-my-size
*The colours on your screen might slightly differ from the actual kimono colours.
*We checked all our Kimonos / Haoris carefully and mentioned the defects we found in the text. Nevertheless, they are vintage so they might have some minor age-related flaws which we didn’t detect.
* All our items are aired for a long time and mostly cleaned.
*Japanese Kimono Products don't have a label. Material and age is an estimation based on our experience and information.
1-3 business days
Buyers are responsible for any customs and import taxes that may apply. I'm not responsible for delays due to customs.
Just contact me within: 14 days of delivery
Ship items back to me within: 30 days of delivery
But please contact me if you have any problems with your order.
Because of the nature of these items, unless they arrive damaged or defective, I can't accept returns for:
Diese Datenschutzrichtlinie beschreibt, wie und wann wir Informationen erfassen, verwenden und weitergeben, wenn du einen Artikel von uns kaufst, uns kontaktierst oder anderweitig unsere Dienste über Etsy.com oder die zugehörigen Websites und Dienste in Anspruch nimmst.
Diese Datenschutzrichtlinie gilt nicht für die Verfahren Dritter, die nicht zu uns gehören und nicht von uns kontrolliert werden, einschließlich Etsy sowie jegliche Dienste von Dritten, auf die du über Etsy zugreifst. Mehr über die Datenschutzpraktiken von Etsy
findest du in Etsys Datenschutzrichtlinie.
Damit wir deine Bestellung abwickeln können, musst du uns bestimmte Informationen bereitstellen (für die du Etsy berechtigt hast, sie uns zur Verfügung zu stellen). Dazu gehören dein Name, deine E-Mail-Adresse, deine Postanschrift, deine Zahlungsinformationen und Angaben zu dem Produkt, das du bestellst. Du hast auch die Möglichkeit, uns weitere persönliche Informationen mitzuteilen (beispielsweise für eine Spezialanfertigung), wenn du dich direkt mit uns in Verbindung setzt.
Wir beziehen uns auf eine Reihe von Rechtsgrundlagen, um deine Daten zu erfassen, zu verwenden und weiterzugeben. Und zwar:
soweit wir deine Informationen zur Bereitstellung unserer Dienste benötigen, beispielsweise, um deine Bestellung abzuwickeln, Konflikte beizulegen oder Kundensupport zu bieten;
wenn du deine ausdrückliche Zustimmung gegeben hast (welche du jederzeit widerrufen kannst), etwa indem du dich für unseren Newsletter-Verteiler angemeldet hast;
wenn es erforderlich ist, um einer gesetzlichen Verpflichtung oder gerichtlichen Verfügung nachzukommen, oder in Verbindung mit rechtlichen Ansprüchen, etwa der Notwendigkeit, Informationen zu deinen Käufen aufgrund der Steuergesetzgebung aufzubewahren; und
soweit zu Zwecken meiner berechtigten Interessen erforderlich – sofern diese berechtigten Interessen nicht durch deine Rechte oder Interessen aufgehoben werden – etwa 1. um meine Dienste bereitzustellen und zu verbessern. Wir nutzen deine Informationen zur Bereitstellung der Dienste, die du von uns angefordert hast, und in unserem berechtigten Interesse, unsere Dienste zu verbessern; und 2. zur Einhaltung von Etsys Verkäuferrichtlinie und Nutzungsbedingungen. Wir verwende deine Informationen bei Bedarf, um unsere Pflichten laut Etsys Verkäuferrichtlinie und Nutzungsbedingungen zu erfüllen.
Weitergabe und Offenlegung von Informationen
Kundendaten sind für unser Geschäft wichtig. Wir geben deine personenbezogene Daten nur aus bestimmten Gründen und unter ganz bestimmten Umständen heraus, und zwar wie folgt:
Etsy: Wir geben Informationen bei Bedarf an Etsy weiter, um unsere Pflichten laut Etsys Verkäuferrichtlinie und Nutzungsbedingungen zu erfüllen.
Dienstleister: Wir beauftragen bestimmte vertrauenswürdige Drittanbieter, für unseren Shop Aufgaben auszuführen und Dienstleistungen zu erbringen, wie beispielsweise Paketdienste. Wir geben deine personenbezogene Daten an diese Drittanbieter weiter, aber nur in dem Umfang, in dem sie für die Durchführung dieser Leistungen erforderlich sind.
Unternehmensübertragungen: Wenn wir unser Unternehmen verkaufen oder mit einem anderen fusionieren, können wir deine Informationen im Rahmen dieser Transaktion offenlegen, soweit gesetzlich zulässig.
Einhaltung von Gesetzen: Wir können deine Daten erfassen, verwenden, aufbewahren und weitergeben, wenn wir in gutem Glauben annehmen, dass dies angemessen und notwendig ist, um: a) auf ein rechtliches Verfahren oder auf behördliche Anforderungen zu reagieren; b) unsere Verträge, Bedingungen und Richtlinien durchzusetzen; c) Betrug und andere rechtswidrige Handlungen, Sicherheits- oder technische Probleme zu verhindern, zu untersuchen und zu beheben oder d) die Rechte, das Eigentum und die Sicherheit unserer Kunden oder anderer Personen zu schützen.
Vorratsdatenspeicherung
Wir speichern deine personenbezogenen Daten nur so lange, wie es erforderlich ist, um dir unsere Dienste bereitzustellen, und wie in unserer Datenschutzrichtlinie beschrieben. Es ist jedoch möglich, dass wir diese Informationen aufbewahren müssen, um gesetzliche Pflichten und Vorschriften zu erfüllen, Streitigkeiten beizulegen und unsere Vereinbarungen durchzusetzen. Im Allgemeinen bewahren wir deine Daten für folgenden Zeitraum auf: 4 Jahre.
Übertragung personenbezogener Daten in Länder außerhalb der EU
Wir können deine Informationen über Hosting-Dienste von Drittanbietern in den USA und anderen Ländern speichern und verarbeiten. Daher können wir deine personenbezogenen Daten in Länder übertragen, deren Gesetze zu Datenschutz und behördlicher Überwachung sich von den entsprechenden Gesetzen in deinem Land unterscheiden. Wenn davon auszugehen ist, dass wir Informationen über dich in Länder außerhalb der EU übertragen, stütze ich mich auf den EU-US-Datenschutzschild als Rechtsgrundlage für die Übertragung, da Google Cloud nach dem EU-US-Datenschutzschild zertifiziert ist.
Deine Rechte
Wenn du in bestimmten Regionen wohnst, einschließlich der EU, hast du eine Reihe von Rechten in Bezug auf deine personenbezogenen Daten. Einige dieser Rechte gelten allgemein und andere nur in bestimmten Fällen. Nachfolgend sind diese Rechte beschrieben:
Zugang: Du hast möglicherweise das Recht, Zugang zu den personenbezogenen Daten zu erhalten, die wir zu dir gespeichert haben, und eine Kopie davon zu bekommen, indem du mich über die nachstehenden Kontaktinformationen anschreibst.
Änderung, Einschränkung, Löschung: Du bist möglicherweise auch berechtigt, deine personenbezogenen Daten zu ändern, unsere Nutzung dieser Daten zu beschränken oder sie zu löschen. Mit Ausnahme außergewöhnlicher Umstände (etwa wenn wir Daten aus rechtlichen Gründen speichern müssen) werde ich deine personenbezogenen Daten im Allgemeinen auf Anfrage löschen.
Widerspruch: Du kannst dem widersprechen, 1. dass wir einige deiner Daten im Hinblick auf unsere legitimen Interessen verarbeiten und 2. dass du Marketing-Nachrichten von uns erhältst, nachdem du dem zuvor ausdrücklich zugestimmt hast. In solchen Fällen werden wir deine personenbezogenen Daten löschen, es sei denn, wir können überzeugende schutzwürdige Gründe für ihre weitere Verwendung nachweisen oder sie ist aus rechtlichen Gründen erforderlich.
Beschwerde: Wenn du in der EU wohnst und Bedenken hinsichtlich meiner Nutzung deiner Daten vorbringen möchtest – unbeschadet anderer dir zustehender Rechte – bist du berechtigt, dich mit diesen Anliegen an deine lokale Datenschutzbehörde zu wenden.
So kontaktierst du uns
Im Sinne der EU-Datenschutz-Grundverordnung sind wir, Milanka Burkart und Petra Tanaka, die Datenverantwortlichen für deine personenbezogenen Daten. Wenn du Fragen oder Bedenken hast, kannst du uns unter KimonoMaedchen@gmail.com kontaktieren. Alternativ kannst du uns unter folgender Adresse anschreiben:
Milanka Burkart, Damaschkestr. 75a, 91056 Erlangen
DATENSCHUTZERKLAERUNG für die Nutzung von Google Analytics
Diese Website nutzt Funktionen des Google Analytics. Anbieter ist die Google Inc. 1600 Amphitheatre Parkway Mountain View, CA 94043, USA. Google Analytics verwendet sog. “Cookies”. Das sind Textdateien, die auf Ihrem Computer gespeichert werden und die eine Analyse der Benutzung der Website durch Sie ermöglichen. Die durch den Cookie erzeugten Informationen über Ihre Benutzung dieser Website werden in der Regel an einen Server von Google in den USA übertragen und dort gespeichert.Im Falle der Aktivierung der IP-Anonymisierung auf dieser Webseite wird Ihre IP-Adresse von Google jedoch innerhalb von Mitgliedstaaten der Europäischen Union oder in anderen Vertragsstaaten des Abkommens über den Europäischen Wirtschaftsraum zuvor gekürzt. Nur in Ausnahmefällen wird die volle IP-Adresse an einen Server von Google in den USA übertragen und dort gekürzt. Im Auftrag des Betreibers dieser Website wird Google diese Informationen benutzen, um Ihre Nutzung der Website auszuwerten, um Reports über die Websiteaktivitäten zusammenzustellen und um weitere mit der Websitenutzung und der Internet-nutzung verbundene Dienstleistungen gegenüber dem Websitebetreiber zu erbringen. Die im Rahmen von Google Analytics von Ihrem Browserübermittelte IP-Adresse wird nicht mit anderen Daten von Google zusammengeführt. Sie können die Speicherung der Cookies durch eine entsprechende Einstellung Ihrer Browser-Software verhindern; wir weisen Sie jedoch darauf hin, dass Sie in diesem Fall gegebenenfalls nicht sämtliche Funktionen dieser Website vollum-fänglich werden nutzen können. Sie können darüber hinaus die Erfassung der durch das Cookie erzeug-ten und auf Ihre Nutzung der Website bezogenen Daten (inkl. Ihrer IP-Adresse) an Google sowie die Verarbeitung dieser Daten durch Google verhindern, indem sie das unter dem folgenden Link verfügbare Browser-Plugin herunterladen :http://tools.google.com/dlpage/gaoptout?hl=de
Demografische Merkmale bei Google Analytics
Diese Website nutzt die Funktion “demografische Merkmale” von Google Analytics. Dadurch können Berichte erstellt werden, die Aussagen zu Alter, Geschlecht und Interessen der Seitenbesucher enthalten. Diese Daten stammen aus interessen-bezogener Werbung von Google sowie aus Besucherdaten von Drittanbietern. Diese Daten können keiner bestimmten Person zugeordnet werden. Sie können diese Funktion jederzeit über die Anzeigeneinstellungen in Ihrem Google-Konto deaktivieren oder die Erfassung Ihrer Daten durch Google Analytics wie im Punkt “Widerspruch gegen Datenerfassung” dargestellt generell untersagen.
WIDERSPRUCH gegen Datenerfassung
Sie können die Erfassung Ihrer Daten durch Google Analytics verhindern, indem Sie auf folgenden Link klicken. Es wird ein Opt-Out-Cookie gesetzt, der die Erfassung Ihrer Daten bei zukünftigen Besuchen dieser Website verhindert: Google Analytics deaktivieren. Mehr Informationen zum Umgang mit Nutzerdaten bei Google Analytics finden Sie in der Datenschutzerklärung von Google: https://support.google.com/analytics/answer/6004245?hl=deSocial Plugins
Auf allen Etsy-Seiten werden Social Plugins sozialer Netzwerke wie Facebook. Pinterest, Twitter, Google usw. verwendet. Wenn Sie bei Etsy eine Shop- oder Artikelseite aufrufen, welche solche Plugins enthalten, stellt Ihr Browser bei Benutzung dieses Buttons eine direkte Verbindung zu den Servern der jeweiligen externen Seite her und gibt automatisch Informationen wie Interesse an bestimmten Artikeln, Protokolldaten sowie IP-Adressen an den jeweiligen Server, der sich zumeist in den USA befindet, weiter. Wenn Sie nicht möchten, dass die jeweilige Social Media Seite, die über Etsy von Ihnen gesammelten Daten unmittelbar Ihrem Social Media-Profil zuordnet, müssen Sie sich vor Ihrem Besuch über den Plugin, bei dem jeweiligem Anbieter ausloggen. Einstellungsmöglichkeiten zum Schutz Ihrer Privatsphäre entnehmen Sie bitte den Datenschutzhinweisen der jeweiligen Social Media- Seite. Der Käufer kann die Datenverarbeitung im Rahmen der Social-Media-PlugIns auch mit Zusatzprogrammen für den eigenen Browser verhindern - sogenannten Adblockern.
- We recommend professional dry cleaning for all our Kimonos and Haoris.
- Only some Wool and Cotton Kimonos can be carefully hand washed. - We don't take any responsibility in case of damage.
- Do not tumble dry.
Almost all our items have been cleaned before selling.
Kimonos are made of natural fibres and are often stored with insect repellants. In Japan, they use mostly natural products. They tend to have a very distinct odour, its not always to everybody's liking.
Airing the Kimonos thoroughly helps. This is no reason for reclamation.
Please inform us of your telephone number if you choose Express Shipping Option.
Vertragsbedingungen im Rahmen von Kaufverträgen die über die Plattform
zwischen
KimonoMaedchen
Damaschkestr.75a, 91056 Erlangen, - im Folgenden „Anbieter“ -
und
den in § 2 des Vertrags bezeichneten Kunden - im Folgenden „Kunde“ -
geschlossen werden.
§ 1 Geltungsbereich, Begriffsbestimmungen
(1) Für die Geschäftsbeziehung zwischen dem Webshopanbieter „KimonoMaedchen“ (nachfolgend „Anbieter“) und dem Kunden (nachfolgend „Kunde“) gelten ausschließlich die nachfolgenden Allgemeinen Geschäftsbedingungen in ihrer zum Zeitpunkt der Bestellung gültigen Fassung. Abweichende allgemeine Geschäftsbedingungen des Bestellers werden nicht anerkannt, es sei denn, der Anbieter stimmt ihrer Geltung ausdrücklich schriftlich zu.
(2) Der Kunde ist Verbraucher, soweit der Zweck der georderten Lieferungen und Leistungen nicht überwiegend seiner gewerblichen oder selbständigen beruflichen Tätigkeit zugerechnet werden kann. Dagegen ist Unternehmer jede natürliche oder juristische Person oder rechtsfähige Personengesellschaft, die beim Abschluss des Vertrags in Ausübung ihrer gewerblichen oder selbständigen beruflichen Tätigkeit handelt.
§ 2 Vertragsschluss
(1) Der Kunde kann aus dem Sortiment des Anbieters Produkte, insbes. Bekleidungsstücke auswählen und diese über den Button „in den Warenkorb legen“ in einem so genannten Warenkorb sammeln. Über den Button „zahlungspflichtig bestellen“ gibt er einen verbindlichen Antrag zum Kauf der im Warenkorb befindlichen Waren ab. Vor Abschicken der Bestellung kann der Kunde die Daten jederzeit ändern und einsehen. Der Antrag kann jedoch nur abgegeben und übermittelt werden, wenn der Kunde durch Klicken auf den Button „AGB akzeptieren“ diese Vertragsbedingungen akzeptiert und dadurch in seinen Antrag aufgenommen hat.
(2) Der Anbieter schickt daraufhin dem Kunden eine automatische Empfangsbestätigung per E-Mail zu, in welcher die Bestellung des Kunden nochmals aufgeführt wird und die der Kunde über die Funktion „Drucken“ ausdrucken kann. Die automatische Empfangsbestätigung dokumentiert lediglich, dass die Bestellung des Kunden beim Anbieter eingegangen ist und stellt keine Annahme des Antrags dar. Der Vertrag kommt erst durch die Abgabe der Annahmeerklärung durch den Anbieter zustande, die mit einer gesonderten E-Mail (Auftragsbestätigung) versandt wird. In dieser E-Mail oder in einer separaten E-Mail, jedoch spätestens bei Lieferung der Ware, wird der Vertragstext (bestehend aus Bestellung, AGB und Auftragsbestätigung) dem Kunden von uns auf einem dauerhaften Datenträger (E-Mail oder Papierausdruck) zugesandt (Vertragsbestätigung). Der Vertragstext wird unter Wahrung des Datenschutzes gespeichert.
(3) Der Vertragsschluss erfolgt in deutscher Sprache.
§ 3 Lieferung, Warenverfügbarkeit
(1) Von uns angegebene Lieferzeiten berechnen sich vom Zeitpunkt unserer Auftragsbestätigung, vorherige Zahlung des Kaufpreises vorausgesetzt .
(2) Sind zum Zeitpunkt der Bestellung des Kunden keine Exemplare des von ihm ausgewählten Produkts verfügbar, so teilt der Anbieter dem Kunden dies in der Auftragsbestätigung unverzüglich mit. Ist das Produkt dauerhaft nicht lieferbar, sieht der Anbieter von einer Annahmeerklärung ab. Ein Vertrag kommt in diesem Fall nicht zustande.
(3) Ist das vom Kunden in der Bestellung bezeichnete Produkt nur vorübergehend nicht verfügbar, teilt der Anbieter dem Kunden dies ebenfalls unverzüglich in der Auftragsbestätigung mit.
§ 4 Preise und Versandkosten
(1) Alle Preise, die auf der Website des Anbieters angegeben sind, verstehen sich einschließlich der jeweils gültigen gesetzlichen Umsatzsteuer.
(2) Die entsprechenden Versandkosten werden dem Kunden im Bestellformular angegeben und sind vom Kunden zu tragen, soweit der Kunde nicht von seinem Widerrufsrecht Gebrauch macht. Ab einem Warenbestellwert von 150 EUR liefert der Anbieter an den Kunden versandkostenfrei.
(3) Der Versand der Ware erfolgt per Postversand. Das Versandrisiko trägt der Anbieter, wenn der Kunde Verbraucher ist.
(4) Der Kunde hat im Falle eines Widerrufs die unmittelbaren Kosten der Rücksendung zu tragen.
§ 5 Zahlungsmodalitäten
(1) Der Kunde kann die Zahlung per PayPal und Kreditkarte, vornehmen.
(2) Der Kunde kann die in seinem Nutzerkonto gespeicherte Zahlungsart jederzeit ändern.
(3) Die Zahlung des Kaufpreises ist unmittelbar mit Vertragsschluss fällig. Ist die Fälligkeit der Zahlung nach dem Kalender bestimmt, so kommt der Kunde bereits durch Versäumung des Termins in Verzug. In diesem Fall hat er dem Anbieter für das Jahr Verzugszinsen iHv 5 Prozentpunkten über dem Basiszinssatz zu zahlen.
(4) Die Verpflichtung des Kunden zur Zahlung von Verzugszinsen schließt die Geltendmachung weiterer Verzugsschäden durch den Anbieter nicht aus.
§ 6 Sachmängelgewährleistung, Garantie
(1) Der Anbieter haftet für Sachmängel nach den hierfür geltenden gesetzlichen Vorschriften, insbesondere §§ 434 ff. BGB. Gegenüber Unternehmern beträgt die Gewährleistungsfrist auf vom Anbieter gelieferte Sachen 12 Monate.
(2) Eine zusätzliche Garantie besteht bei den vom Anbieter gelieferten Waren nur, wenn diese ausdrücklich in der Auftragsbestätigung zu dem jeweiligen Artikel abgegeben wurde.
§ 7 Haftung
(1) Ansprüche des Kunden auf Schadensersatz sind ausgeschlossen. Hiervon ausgenommen sind Schadensersatzansprüche des Kunden aus der Verletzung des Lebens, des Körpers, der Gesundheit oder aus der Verletzung wesentlicher Vertragspflichten (Kardinalpflichten) sowie die Haftung für sonstige Schäden, die auf einer vorsätzlichen oder grob fahrlässigen Pflichtverletzung des Anbieters, seiner gesetzlichen Vertreter oder Erfüllungsgehilfen beruhen. Wesentliche Vertragspflichten sind solche, deren Erfüllung zur Erreichung des Ziels des Vertrags notwendig ist.
(2) Bei der Verletzung wesentlicher Vertragspflichten haftet der Anbieter nur auf den vertragstypischen, vorhersehbaren Schaden, wenn dieser einfach fahrlässig verursacht wurde, es sei denn, es handelt sich um Schadensersatzansprüche des Kunden aus einer Verletzung des Lebens, des Körpers oder der Gesundheit.
(3) Die Einschränkungen der Abs. 1 und 2 gelten auch zugunsten der gesetzlichen Vertreter und Erfüllungsgehilfen des Anbieters, wenn Ansprüche direkt gegen diese geltend gemacht werden.
(4) Die sich aus Abs. 1 und 2 ergebenden Haftungsbeschränkungen gelten nicht, soweit der Anbieter den Mangel arglistig verschwiegen oder eine Garantie für die Beschaffenheit der Sache übernommen hat. Das gleiche gilt, soweit der Anbieter und der Kunde eine Vereinbarung über die Beschaffenheit der Sache getroffen haben. Die Vorschriften des Produkthaftungsgesetzes bleiben unberührt.
§ 8 Widerrufsbelehrung
(1) Verbraucher haben bei Abschluss eines Fernabsatzgeschäfts grundsätzlich ein gesetzliches Widerrufsrecht, über das der Anbieter nach Maßgabe des gesetzlichen Musters nachfolgend informiert. Die Ausnahmen vom Widerrufsrecht sind in Absatz (2) geregelt. In Absatz (3) findet sich ein Muster-Widerrufsformular.
Widerrufsbelehrung
Widerrufsrecht
Sie haben das Recht, binnen vierzehn Tagen ohne Angaben von Gründen diesen Vertrag zu widerrufen.
Die Widerrufsfrist beträgt vierzehn Tage ab dem Tag, an dem Sie oder ein von Ihnen benannter Dritter, der nicht Beförderer ist, die Waren in Besitz genommen haben bzw. hat.
Um Ihr Widerrufsrecht auszuüben, müssen Sie uns (KimonoMaedchen) mittels einer eindeutigen Erklärung (zB ein mit der Post versandter Brief, Telefax oder E-Mail) über Ihren Entschluss, diesen Vertrag zu widerrufen, informieren. Sie können dafür das beigefügte Muster-Widerrufsformular verwenden, das jedoch nicht vorgeschrieben ist.
Zur Wahrung der Widerrufsfrist reicht es aus, dass Sie die Mitteilung über die Ausübung des Widerrufsrechts vor Ablauf der Widerrufsfrist absenden.
Folgen des Widerrufs
Wenn Sie diesen Vertrag widerrufen, haben wir Ihnen alle Zahlungen, die wir von Ihnen erhalten haben, einschließlich der Lieferkosten (mit Ausnahme der zusätzlichen Kosten, die sich daraus ergeben, dass Sie eine andere Art der Lieferung als die von uns angebotene, günstige Standardlieferung gewählt haben), unverzüglich und spätestens binnen vierzehn Tagen ab dem Tag zurückzuzahlen, an dem die Mitteilung über Ihren Widerruf dieses Vertrages bei uns eingegangen ist. Für diese Rückzahlung verwenden wir dasselbe Zahlungsmittel, das Sie bei der ursprünglichen Transaktion eingesetzt haben, es sei denn, mit Ihnen wurde ausdrücklich etwas anderes vereinbart; in keinem Fall werden Ihnen wegen dieser Rückzahlung Entgelte berechnet.
Wir können die Rückzahlung verweigern, bis wir die Ware wieder zurückerhalten haben oder bis Sie den Nachweis erbracht haben, dass Sie die Waren zurückgesandt haben, je nachdem, welches der frühere Zeitpunkt ist.
Sie haben die Waren unverzüglich und in jedem Fall spätestens binnen vierzehn Tagen ab dem Tag, an dem Sie uns über den Widerruf dieses Vertrages unterrichten, an uns zurückzusenden oder zu übergeben. Die Frist ist gewahrt, wenn Sie die Waren vor Ablauf der Frist von vierzehn Tagen absenden.
Sie tragen die unmittelbaren Kosten der Rücksendung der Waren.
Sie müssen für einen etwaigen Wertverlust der Waren nur aufkommen, wenn dieser Wertverlust auf einen zur Prüfung der Beschaffenheit, Eigenschaften und Funktionsweise der Waren nicht notwendigen Umgang mit ihnen zurückzuführen ist.
(2) Das Widerrufsrecht besteht nicht bei Verträgen zur Lieferung von Ton- oder Videoaufnahmen oder Computersoftware in einer versiegelten Packung, wenn die Versiegelung nach der Lieferung entfernt wurde.
(3) Über das Muster-Widerrufsformular informiert der Anbieter nach der gesetzlichen Regelung wie folgt:
Muster-Widerrufsformular
(Wenn Sie den Vertrag widerrufen wollen, dann füllen Sie bitte dieses Formular
aus und senden Sie es zurück.)
— An: KimonoMaedchen, Damaschkestr.75a 91056 Erlangen, kimonomaedchen@gmail.com:
— Hiermit widerrufe(n) ich/wir (*) den von mir/uns (*) abgeschlossenen Vertrag
über den Kauf der folgenden Waren (*)/ die Erbringung der folgenden
Dienstleistung (*)
— Bestellt am (*)/erhalten am (*)
— Name des/der Verbraucher(s)
— Anschrift des/der Verbraucher(s)
— Unterschrift des/der Verbraucher(s) (nur bei Mitteilung auf Papier)
— Datum
(*) Unzutreffendes streichen
§ 9 Schlussbestimmungen
(1) Auf Verträge zwischen dem Anbieter und den Kunden findet das Recht der Bundesrepublik Deutschland unter Ausschluss des UN-Kaufrechts Anwendung. Die gesetzlichen Vorschriften zur Beschränkung der Rechtswahl und zur Anwendbarkeit zwingender Vorschriften insbes. des Staates, in dem der Kunde als Verbraucher seinen gewöhnlichen Aufenthalt hat, bleiben unberührt.
(2) Sofern es sich beim Kunden um einen Kaufmann, eine juristische Person des öffentlichen Rechts oder um ein öffentlich-rechtliches Sondervermögen handelt, ist Gerichtsstand für alle Streitigkeiten aus Vertragsverhältnissen zwischen dem Kunden und dem Anbieter der Sitz des Anbieters.
(3) Der Vertrag bleibt auch bei rechtlicher Unwirksamkeit einzelner Punkte in seinen übrigen Teilen verbindlich. Anstelle der unwirksamen Punkte treten, soweit vorhanden, die gesetzlichen Vorschriften. Soweit dies für eine Vertragspartei eine unzumutbare Härte darstellen würde, wird der Vertrag jedoch im Ganzen unwirksam.
For extrajudicial settlements of consumer disputes, the European Union has launched an online platform ("ODR platform"):
https://ec.europa.eu/consumers/odr